Main Cooling Water Piping System Refurbishment

IMG_3131

Basing on Vivablast’s proven expertise of major cooling water piping projects acquired during the Vung Ang 1 TPP & Nhon Trach 1 & 2 CCPP Projects, Phu My Thermal Power Co. has selected Vivablast to clean, blast & apply high-performance anticorrosion ceramic and protective coatings over a critical internal section of their Phu My 2.1 Cooling Water Piping. The Project is performed during the on-going scheduled Plant shutdown.

Main Cooling Water Piping System Refurbishment