Equipment Daily Maintenance
Duration: 2018 – 2020
Location: Vietnam
Work description:
- Access Method: Scaffolding, Rope Access, Man-lift
- Surface Preparation: Power tool cleaning, HP Water Cleaning, Steel Grit Blasting
- Painting Application




Home » References » Port Equipment Maintenance
Reference Insight
Location
Years
Scope of work
- Access Method: Scaffolding, Rope Access, Man-lift - Surface Preparation: Power tool cleaning, HP Water Cleaning, Steel Grit Blasting- Painting Application
FROM THE BLOG