Home > Refinery construction & maintenance
           

Refinery construction & maintenance

Duration: 2014-2017

Location: Vietnam

Work description:

Mobilization, erection & operation of Vivablast Centralized Painting workshop -200,000 m2 of steel structure and piping, General cosmetic coating.

 

Duration: 2016-2018

Location: Malaysia

Work description:

Surface preparation and painting application for piping of awarded packages at site and workshop in Malaysia

 

Duration: 2017

Location: Vietnam

Work description:

Visual Inspection to determine the damages to be repaired

Cut and removal of damaged and loose hose particles from each cracked position

Abrading the surface by using a strong wire brush

Belzona application

 

 

   

 

Duration: 2020

Location: Vietnam

Work description:

Surface Preparation & Internal Coating Application for Seawater Pipeline

 

 

Other news

Coppyright © 2019 Vivablast. All right reserved