Home > Wind-farm in vietnam
           

Wind-farm in vietnam

Project: Wind Tower Maintenance
Duration: 2018, 2019, 2020
Work description:
  • Access method: Rope Access (IRATA level I, II, III)
  • Surface Preparation
  • Anti-corrosion Application
  • Tower cleaning & Basement sealing
  • Site Survey and Blade Access Platform Rental
  • Bolt and Washer Replacement

 

 

 

 

 

 

 

Other news

Coppyright © 2019 Vivablast. All right reserved